GTA San Andreas almost had its own Alcatraz — and the proof is hiding in plain sight.
GTA VI Iran
Cut ContentGTA: San Andreas6 views

GTA San Andreas almost had its own Alcatraz — and the proof is hiding in plain sight.

A beta version of GTA San Andreas included an Alcatraz-style prison island in San Fierro Bay, visible on maps inside Mike Toreno's Ranch and the Lil' Probe Inn. It was replaced by a cargo ship in the final release, but developers forgot to update dialogue: Mike Toreno still tells CJ that Sweet is imprisoned 'upstate,' even though no prison exists in that area.

Source: Alcatraz — CC BY-SA

The full story

The beta prison island still haunts San Fierro Bay on maps inside Toreno's Ranch and Lil' Probe Inn, a ghost of cut content.
1

The beta prison island still haunts San Fierro Bay on maps inside Toreno's Ranch and Lil' Probe Inn, a ghost of cut content.

Toreno's lying to CJ about Sweet being 'upstate' — devs swapped the prison for a cargo ship but never fixed the dialogue.
2

Toreno's lying to CJ about Sweet being 'upstate' — devs swapped the prison for a cargo ship but never fixed the dialogue.

The beta map lays it bare — where Alcatraz-style terror was planned before Rockstar scrapped it for a rusty boat.
3

The beta map lays it bare — where Alcatraz-style terror was planned before Rockstar scrapped it for a rusty boat.